What Northline is building and has delivered at Birch House. 1 active · 4 completed.

Northline technician installing the exterior camera and access hardware
Active projectIn progress

Garage access modernization

Replacing the garage access controller and reader, adding a smart lock and a dedicated camera.

Installation62% complete

Project lead

Aaron K.

Started

May 12, 2026

Target completion

June 16, 2026

The original garage controller is being replaced with a current-generation unit, paired with a new reader, a smart lock on the interior door, and a camera covering the bay. The work ties into the existing network and automations so entry stays logged and the EV charger keeps its overnight schedule. Commissioning is planned for mid-June with no impact to the rest of the property.

View installed devices

Progress photos

Newly installed access reader
Newly installed access reader
New access controller and switching wired in
New access controller and switching wired in
Structured cabling run to the network closet
Structured cabling run to the network closet

Milestones

  1. Site assessment

    May 12, 2026

  2. Design review

    May 19, 2026

  3. Equipment procurement

    May 27, 2026

  4. Installation

    In progress

    June 2, 2026

    Reader and camera mounted; smart lock fitting underway.

  5. Commissioning

  6. Final handover

Recent updates

  1. Garage camera mounted and aimed; field of view confirmed with the household.

    May 31, 2026 · Jordan P.

  2. New access reader wired and powered at the side door.

    May 29, 2026 · Jordan P.

  3. Equipment delivered to the site: controller, reader, smart lock, and camera.

    May 27, 2026 · Aaron K.

  4. Design review approved; device placements finalized with the client.

    May 19, 2026 · Aaron K.

  5. Site assessment completed; existing garage controller flagged for replacement.

    May 12, 2026 · Aaron K.

Completed projects

Refreshed network equipment after the upgrade

Wi-Fi 6E network upgrade

Completed

Completed February 22, 2026

Coverage rebuilt for both buildings with isolated segments for cameras, control, and guests.

Mechanical-room controller and automatic shutoff valve

Leak detection rollout

Completed

Completed November 18, 2025

Sensors added in the kitchen, mechanical room, and utility, wired to auto-close the smart shutoff valve on a confirmed leak.

EV charger

Driveway and garage EV chargers

Completed

Completed June 12, 2025

Two Level 2 chargers installed with a load controller that staggers draw below the panel limit.

Smart-home control and integration

Whole-home systems install

Completed

Completed September 20, 2024

Security, climate, EV, and network commissioned across both buildings with fiber backhaul between them.